Artificial Intelligence Project Controls Science (AIPCS)
From contract definition to governed baseline in one continuous system.
Accountable. Traceable. Controlled.
AI generates. Engineers govern. The record is sealed.
Book an AIPCS scoping call See the system workIf the button does not open your email, write to [email protected].
Built in Primavera P6. Every schedule, revision and forecast is validated by a skilled project controls team at every update.
What your project controls function gets
AIPCS builds the baseline from your contract, then runs the controls cycle on top of it. A qualified professional signs every output before it enters your baseline.
WBS, cost estimate, P6-compatible schedule and risk register built from your contract documents, with material take-off from day one.
CPI, SPI and forecast final cost updated at every cycle, so problems surface while they are still cheap to fix.
Progress and performance reports produced from the controlled data. Your team reviews and decides instead of assembling.
Every decision carries a name and a timestamp. When a variation claim lands, you can show who approved what, and when.
The AAR Protocol
Accept. Adjust. Reject. Every output, every time, with a name and a timestamp.
The output is correct. It is approved and recorded.
The output is close. The professional corrects it and the change is recorded.
The output is wrong. It is discarded and the reason is recorded.
The reviewer standard
Every AIPCS output is accepted, adjusted or rejected by a qualified professional. The sharper your planners and controllers, the stronger your baseline. Become a Planner covers CPM, baselines, earned value, risk and forensic planning in 8 parts and 44 chapters, taught from real EPCM practice, and includes a year in the Project Controls Lab.
Live demonstration
Set a design parameter and a start date. AIPCS builds a scheduled baseline with the critical path, the quantities, a cost estimate, a risk register and a phase gate. Then you accept, adjust or reject each output and watch the record seal.
Illustrative parametric outputs built from typical industry ratios, to show how the system works. Not an estimate for your project. Dates use calendar days here. The full system runs on your Primavera P6 calendars.
Experience behind the system
Ramon Granados is a Civil, Environmental and Project Controls Engineer. As part of the project management team (PMT), he has helped deliver USD $100B+ in large and complex industrial and infrastructure assets across engineering, procurement and construction in 14 countries. Using Primavera planning tools since 1987. Member of Engineers Australia under the Washington Accord.
Engage
Guided implementation. Your project controls team is guided through every phase.
Firm-level deployment. The platform is licensed across your organisation.
Join the founding cohort. Limited to 10 firms. Founding pricing closes 31 December 2026.
Be among the first project professionals to govern AI on live capital projects. To enquire, write to [email protected].
Tell us about the project. We will come back with how AIPCS would run on it.
Book an AIPCS scoping callOr write to [email protected].